Hot and cold water system installed

Whilst waiting for the funding to come through for the ground source heating system, the Trustees, in association with our contractor Anglia Heating, have set aside enough funding to install the hot and cold water system.  This will enable much of the plant room work to be carried out so that when the funds are in place for the ground source heat pump and installation of the bore holes most of the other work in in place and ready to be connected to.  We have also completed all electrical works as far as possible and completed the fire alarm installation.

DSC04447

Categories
Uncategorized

Doors have arrived!

There are over 50 doors to install in the Poppy Centre building and many of these have started to be delivered.  They are all 30 minute fire doors, so they are extremely heavy.  The installation process begins.

DSC04443

Categories
Uncategorized

Stalham Christmas Tree Festival

Each year there is a Christmas Tree festival in St Mary’s Church in Stalham.  For the past few years the Poppy Centre has provided a tree.  Many of the trees on display are from local groups, businesses and the schools, promoting who and what they are.  This year we wanted to do something different – but could not think what to do.  Until a dress was donated to the Poppy Centre charity shop.  It was bright green and with a few lights and a borrowed mannikin we had a unique offering.  In fact it was so unique that Radio Norfolk featured it as part of their Sunday morning programme Treasure Quest.

dsc04319

Categories
Uncategorized

Lack of Funds is holding us back

Progress has been slow due to lack of funds.  Since July the floor coverings have been completed, the plant room has been prepared ready for the ground source heat pump installation, the gshp ground survey has been completed and the remaining sanitary ware has been installed.  Everything is set ready for when our funding for the gshp comes through.  Meanwhile, work continues to finishing off all areas in respect of carpentry and painting as funds permit.

Categories
Uncategorized

Path works commence

The drains have now been connected and work has commenced to the path ways which will be fully accessible and link the car park to the new building.

DSC04226  DSC04229  DSC04237

Categories
Uncategorized

We’re getting there!

In the past few weeks progress has been steady.  We now have all the floor coverings to the first floor and the ground floor is in progress.

The toilets, showers and changing rooms are now almost complete and the skirting and architrave is now being fitted to all areas.

We have also had the sign fitted to the outside of the building.

DSC04108  DSC04135  DSC04148  DSC04283

Categories
Uncategorized

Windows and Doors installed!

We now have windows and doors installed – what a difference this makes:

DSC04078 DSC04077 DSC04076

Categories
Uncategorized

Floor covering laid to main hall

The main hall of the Poppy Centre building now has the floor covering laid.  What a difference it makes – we are now really working towards completion of this building.

DSC04061

Categories
Uncategorized

Charity Shop reaches £100,000

Today our Charity Shop, at 76 – 82 Stalham High Street has now raised in excess of £100,000 profit  towards the Poppy Centre building project.  This is a huge achievement is due to the fact that the shop is run entirely by volunteers.  A massive thank you to all of them.

Categories
Uncategorized

We have sinks!

Work continues to the toilet and changing room areas.  Wall panelling has now been installed to the male and female toilet areas, the toilet frames and vanity units have been installed and we now even have sinks!  It is really starting to look like a finished building.  All the plastering has now been completed to both ground and first floor.  Decoration continues, work will continues to all the toilet and changing room areas.  The windows and front door are scheduled to be installed at the end of February.  We are still on course to open for Easter.

DSC03987