September – December 2012

Posted By :
Comments : 0

With the opening of the Charity Shop funds were building towards the project.  Blockwork continued to the inside of the building, the electric and water connections were made.  By December all the external brickwork was complete, internal brickwork to first floor level, internal block work to first floor level and most of the first floor joists were in position.

The site was tidied up and levelling of the ground to the front of the building took place.